Construction of steel structure for industrial building located in Mwanza region. Steel structure size is 56M X 104M by 6.7M

Construction of steel structure for industrial building located in Mwanza region. Steel structure size is 56M X 104M by 6.7M

Client:

U FRESH FOOD LIMITED

Location:

MWANZA - TANZANIA

Project Year:

NOV 2021

Duration:

1 YEAR

Contract value:

CONFIDENTIAL

Status:

COMPLETED

Progress monitoring. Planning and managing a project’s construction phase. Coordinating with principal designer and the client. Staying on top of the work done on site. Making sure that health and safety specifications are followed. Continuously reviewing, modifying, and updating the programme of the project based on the latest changes and received feedback.

0+

We’ve had so many compliments from friends and family

0+

Our dedication to sustainable building practices

0+

Success rate of bot case completion

0+

Hours delivered back to the business

What Are The 5 Stages Of Building Construction?

Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies.

Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies. Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies.

Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies.

Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies.

Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies.

Proactively restore professional data and multimedia based collaboration and idea sharing. Credibly top line deliverables and cross platform manufactured products. Dramatically facilitate enabled value with seamless growth strategies.

Related Project

Client:

Jv betwe..

Project Year:

JUL 2019

Duration:

11 MONTHS

Status

Completed

Commercial Building At Masaki Dsm

Netus platea nec commodo

Client:

NURAN DEv..

Project Year:

AUG 2024

Duration:

2YEARS

Status:

ONGOING

PLOT NO 1202 MASAKI

Netus platea nec commodo

Client:

METAVIEW LTD

Project Year:

DEC 2023

Duration:

2Y

Status:

ONGOING

Client:

DED-NGA...

Project Year:

JUL 2023

Duration:

1YEAR

Status:

COMPLETED

NGARA DC HEAD QUARTER CONSTRUCTION

Netus platea nec commodo

Client:

SAFE INV...

Project Year:

DEC 2023

Duration:

1Y, 3M

Status:

ONGOING

TANGA CENTRAL AREA PROJECT

Netus platea nec commodo